Projects

At Coldstar we pride ourselves on the projects we have completed over the years and can provide supervised site visit to various sites which allow our Customer to see what they are buying and to get a feel of the job in hand before they commit to a project.

We can provide a price for the supply of a Single Piece of equipment or a complete Factory refit.

All our installation work is carried out by our by our team of qualified and fully trained engineers. They will ensure that all Refrigeration and Air Conditioning installations are carried out to the highest standard and meet all regulatory standards. All installations carry our 6 monthly service agreement which will provide years of hassle free running.

Below are some examples of Projects we have undertaken:-

Hughendon Manor

Coldstar were employed to install 3 x Air Conditioning Systems within the onsite offices and 1 x Air to Air Heat Recovery System within the restaurant area which are both Listed Buildings.

As you can imagine the logistics of working in this environment brought many challenges to which Coldstar were able to overcome through attention to detail.

Not only was the project finished ahead of time and on budget the integrity of the building and the aesthetics of the building.

Admiral Harding

Admiral Harding Ltd is the outcome of the UNIFICATION of Admiral Marine Supplies Ltd and Harding Brothers (S.C.) Ltd two of the largest ships suppliers in the industry, operating out of the U.K.

UNITED, Admiral Harding Ltd has now become the largest supplier to the shipping industry, with the capability of supplying goods and services to cruise, offshore, military and merchant vessels worldwide through our global proven network.

Coldstar were employed to provide Admiral Harding with a new drive in Freezer Coldroom measuring 15m x 23m x 6m high. Coldstar provided the coldroom, flooring and Refrigeration system which included a 50% back-up system to ensure the complete peace of mind for the customer.

We were also employed to dis-mantle the existing 11m x 11m x 5m high remove the panelling for re-use and remove the concrete floor and re-install into the Companies new Headquarters. We also upgraded the Refrigeration system to provide a 50% back-up in case of failures on the existing equipment.

The project lasted 3 months and the equipment was switched on and down to temperature 4 days earlier than planned with great satisfaction from the customer which enabled him to move out of the existing premises before the desired date.

Novotel City Centre Hotel.

The Novotel Bristol is a 4 star hotel in the heart of Bristol. Five minutes walk from Bristol Temple Meads Railway station and in close proximity to the shopping centre and all the main leisure attractions as well as bars and restaurants in the city. With a conference suite of seven rooms for up to 200 people plus WiFi in most bedrooms and all meeting rooms. At the end of an eventful day, enjoy our Elements Restaurant and Bar or relax with room service. Onsite pay parking and accessible facilities.

Coldstar were employed by Novotel to install Air Conditioning within the onsite Call Centre which runs 24/7. Coldstar had to plan and implement a package that meant the call centre did not shut down at any time and did not disrupt the call centre.

This meant planning a schedule of works and sticking to them and again we delivered on time and on budget with the minimal of fuss to the client.

As with all projects you are only as good as your last Project completed and we at Coldstar believe we can deliver the best without sacrificing any of our beliefs to deliver the best, be the best and provide the best!!!!

© Copyright Coldstar (UK) Ltd SiteWizard.co.uk Website Design & eCommerce Software Shopping Cart Solutions